Welcome to Calibre Developments Mould Remediation Division

4 Steps to a Successful Mould Remediation Project

  1. Identify the extent of the problem – mould is a symptom of moisture. This must be addressed to prevent the mould from reoccurring. CDI often works with third-party consultants on medium and large mould remediation projects.
  2. Develop a project specific plan including
    • Safe work practices
    • Steps to be taken to prevent mould from spreading
    • Air handling/filtration equipment required
    • Waste removal
  3. Execute
  4. Reconstruction: Either restore the original finish or take the opportunity to conduct improvements. CDI can help with both options.